I used Outlook Projects for a complete refurbishment of the Bangor Tavern in 2008/2009 with a total cost of over $2,500,000. The refurbishment included new bars, kitchen, upgrade audio visual, air-conditioning, refidgeration, beer systems, new joinery and furniture most of which was built by Outlook projects.
I found John Lam the director of outlook projects a pleasure to work with at all times. John and his team of experienced tradesmen and associated assistants finished all stages on time and on budget and all work was completed of a sound quality. John is always present on sight leading the team hence OHS and value from all tradesmen is assured.
The Bangor Tavern traded everyday throughout the renovations, which meant that the gaming room was relocated as well as a temporary bar being built to service the entire Tavern and a temporary TAB and the trade held up.
John's strength is his experience in the Hotel industry giving him the edge with a sound knowledge of Gaming, Wagering, audio visual, kitchens, and bar setups.